PTC Power-Up Test

OBSID 0x50000141, 2009-05-30 (Commissioning Phase)

1. Test Basics

Data were downloaded from ops_1@chesterfield on 2009 Jun 3 with the export utility from HIPE (BUILDNUM 229). Converted format was selected. Minor problem: Large forward-and-back, two-sample timing jumps in PHOTF/TIME at changes in heater setting.

Minor problem: Readout of NHK/TCHTRV saturates at 2.4 V (32767 ADU), although applied heater voltage clearly exceeds that in this test.


2. Data Processing

Not much more than adding PHOTOFF/PHOTOFFxxx in to the PHOT/PHOTFARRAYxxx, using PHOT/TIME and PHOTOFF/TIME to time coordinate.

3. Results



4. Conclusions

Looks like it worked OK.
CDD, 2009 Jun 4